A perimeter's reliability depends on precise assembly. Follow this sequence checklist to ensure perfect alignment, correct torque lockups, and complete physical integrity.

From line to handover

Installation Workflow Overview

Work through the sequence in order so every post, panel and gate is checked against the same line, level and load assumptions.

Set Out the Line
01

Set Out the Line

  • Confirm datum and corner points
  • Mark post centerlines
  • Allow for gate openings
Prepare Foundations
02

Prepare Foundations

  • Clear underground service risks
  • Verify hole depth
  • Prepare drainage and concrete footings
Plumb Posts
03

Plumb Posts

  • Check plumb on both axes
  • Install temporary bracing
  • Hold alignment while concrete cures
Fix Panels
04

Fix Panels

  • Maintain the specified ground clearance
  • Fit clamps and anti-tamper fixings correctly
  • Keep the fence line straight
Install Gates
05

Install Gates

  • Reinforce gate posts
  • Verify operating clearances
  • Align hinges and latches
Handover Check
06

Handover Check

  • Inspect all fasteners
  • Repair surface damage
  • Complete photographic and acceptance records

Choose the right support

Foundation, Post & Gate Decisions

Select the installation method according to ground conditions, fence height, wind load and gate load, rather than relying on site convention alone.

Embedded Concrete Footing

Embedded Concrete Footing

Suitable foropen soilfieldslong perimeter runs

Deep footings suit continuous fence runs and provide stable resistance to wind and impact loads.

Base Plate on Slab

Base Plate on Slab

Suitable forconcrete yardswall topsretrofit projects

For installation on existing concrete, verify slab strength, anchor spacing and edge distances.

Gate Interface

Gate Interface

Suitable forswing gatessliding gatescantilever gates

Treat each gate post as an independent load-bearing structure with stable interfaces for movement, hinges and latches.

Field control points

Common Installation Mistakes to Avoid

Turn commonly overlooked site risks into practical inspection steps before they affect the installation.

01

Line Drift

ProblemSmall setting-out errors multiply across long fence runs.

Line Drift
Control Point

Fix the datum and corner points before excavation begins.

02

Weak Footing

ProblemInsufficient hole depth or poor foundation preparation reduces resistance to wind and impact loads.

Weak Footing
Control Point

Verify hole depth and ensure the bearing surface is clean and stable.

03

Coating Damage

ProblemDragging components or cutting on site can damage the protective coating.

Coating Damage
Control Point

Protect components during installation and repair exposed steel immediately.

04

Gate Sag

ProblemUndersized gate posts or misaligned hinges can cause long-term sagging and latch failure.

Gate Sag
Control Point

Verify the opening, hinge axis and gate-post reinforcement.