
Set Out the Line
- Confirm datum and corner points
- Mark post centerlines
- Allow for gate openings

A perimeter's reliability depends on precise assembly. Follow this sequence checklist to ensure perfect alignment, correct torque lockups, and complete physical integrity.
From line to handover
Work through the sequence in order so every post, panel and gate is checked against the same line, level and load assumptions.






Choose the right support
Select the installation method according to ground conditions, fence height, wind load and gate load, rather than relying on site convention alone.

Suitable foropen soilfieldslong perimeter runs
Deep footings suit continuous fence runs and provide stable resistance to wind and impact loads.

Suitable forconcrete yardswall topsretrofit projects
For installation on existing concrete, verify slab strength, anchor spacing and edge distances.

Suitable forswing gatessliding gatescantilever gates
Treat each gate post as an independent load-bearing structure with stable interfaces for movement, hinges and latches.
Field control points
Turn commonly overlooked site risks into practical inspection steps before they affect the installation.
ProblemSmall setting-out errors multiply across long fence runs.

Fix the datum and corner points before excavation begins.
ProblemInsufficient hole depth or poor foundation preparation reduces resistance to wind and impact loads.

Verify hole depth and ensure the bearing surface is clean and stable.
ProblemDragging components or cutting on site can damage the protective coating.

Protect components during installation and repair exposed steel immediately.
ProblemUndersized gate posts or misaligned hinges can cause long-term sagging and latch failure.

Verify the opening, hinge axis and gate-post reinforcement.