A smooth installation begins with a checked setting-out plan. Mark the fence line, corners, gates and changes in direction before fixing posts, then verify the finished panel run against the site drawings.
Install posts and fittings in the agreed sequence so the panel connections remain accessible. Keep each panel supported while the next post and fixing points are checked, especially around corners and gate openings.
Finish with a line, level and connection check across the full run. Confirm that panels are secure, posts are stable and the packing list matches the components delivered before handing the area over for use.